EV Charging
Workplace EV-Charging Site Requirements
Workplace EV charging depends on available electrical capacity, load management, charger selection, metering, access control and safe cable routing.
Related service
Workplace EV Charging
Workplace charging with load management, access control and metering for employee and fleet use.
Learn moreMore guidance
Knowledge
EV Charging for Apartment Blocks
Apartment-block charging must address supply capacity, freeholder and landlord permissions, shared access, metering and load management.
Learn moreKnowledge
EV Load Management Explained
Load management dynamically shares available electrical capacity across chargers so more vehicles can charge without exceeding the site's maximum demand.
Learn moreKnowledge
What Is an EICR?
An EICR is a formal, documented assessment of a fixed electrical installation against BS 7671, recording classified observations and a satisfactory or unsatisfactory outcome.
Learn moreKnowledge
What Is Included in an EICR?
An EICR covers the consumer unit, protective devices, circuits, earthing and bonding, and a representative sample of the installation, with observations and test results recorded.
Learn moreThis article provides general guidance and distinguishes legislation, British Standards and good practice. It is not legal advice. Always confirm the specific duties applying to your property and tenure.
