Knowledge article · Pillar
Commercial EV Charging Explained
Commercial EV charging installations must be safely designed to BS 7671 (including Section 722), with the right supply capacity, earthing, protection and load management.
Commercial EV charging installs charge points for staff, fleet, visitors or the public. Done well, it is a valuable asset; done badly, it creates safety risks and overloads. Every installation should be designed and installed to BS 7671, including Section 722 which covers electric vehicle charging specifically.
What a compliant installation needs
- Adequate supply capacity — confirmed by a capacity assessment so chargers do not overload the incoming supply.
- Correct earthing — including protection against an open-PEN fault on PME supplies (see earthing considerations).
- Appropriate RCD protection and dedicated circuits.
- Load management where several chargers share a supply (see load management).
Planning your installation
The starting point is a site survey and capacity assessment to understand what the existing supply and distribution board can support, and what upgrades (if any) are needed. From there, the number and speed of chargers, cabling routes and management strategy are designed.
Ongoing responsibilities
EV chargers are electrical equipment that needs maintenance and, for shared or paid facilities, back-office management via OCPP and payment-enabled charging. This pillar links to detailed guidance on each aspect for workplaces, landlords, apartment blocks and fleets.
Frequently asked questions
What standards apply to commercial EV charge points?
EV charging installations are designed to BS 7671, including Section 722 which covers electric vehicle charging. This addresses matters such as earthing arrangements (including open-PEN protection on PME supplies), RCD protection and equipment selection.
Related service
EV Charging
Surveyed, load-managed EV-charging infrastructure for workplaces, apartment blocks, fleets and commercial sites.
Learn moreMore in this topic
Knowledge article
EV Charging for Apartment Blocks
EV charging in apartment blocks needs shared-supply design, load management, individual billing and careful earthing, coordinated between freeholder, agent and residents.
Learn moreKnowledge article
Electrical Capacity Assessments for EV Charging
A capacity assessment measures a site's spare electrical capacity to determine how many EV chargers it can support before any supply or distribution board upgrade.
Learn moreKnowledge article
EV Charger Maintenance Explained
EV chargers need periodic inspection, testing and servicing to stay safe and reliable — checking protection, connections, enclosures, software and charging performance.
Learn moreKnowledge article
EV Charging Distribution Board Requirements
EV chargers need suitably rated, protected circuits from an adequate distribution board — with correct RCD/RCBO protection and capacity for the charging load.
Learn moreThis article provides general guidance and distinguishes legislation, British Standards and good practice. It is not legal advice. Always confirm the specific duties applying to your property and tenure.